Wednesday, May 26, 2010

Kalinga Narthana Perumal Temple, Oothukkakadu, Kumbakonam

This is an article published in THE HINDU- Friday Review on May 21, 2010.
I have personally visited the several times on Rohini nakshatra day and seen the poojas performed there. The temple is in damaged condition and surely needs the help of Hindu philanthropists. Please Help!!!!!!

KALINGA NARTHANA PERUMAL- OOTHUKKADU- KUMBAKONAM




Referred to as ‘Then Gokulam’, the Kalinga Narthana temple in Oothukadu near Kumbakonam is believed to be the only temple that is exclusively dedicated to him (Kalinga Narthana). The temple dates back to the Chozha period though specific data/proof is not available.

The story goes that this place was once a garden of flowers. Residing at the Kailasanatha temple in Aavoor, Nandini and Patti, the calves of Kamadhenu, were providing milk to the Lord. Every morning, the two would also graze across to the nearby Oothukadu Village (2 km away) and collect flowers for the Lord from the garden.

On one such occasion, the two listened to Sage Narada’s narration of the story of Lord Krishna and his Kalinga Narthana. Hearing the story of the five year old (child) Krishna taking on the poisonous snake (Kalinga) and performing the Kalinga Narthana, Nandini and Patti are said to have been shocked by the tough task little Krishna took upon himself.

A worried Kamadhenu approached Krishna at Vaikuntam seeking a solution to her children’s shocked state of mind. Responding to her request, Krishna appeared at the garden in Oothukadu and performed yet again, with ease, Kalinga Narthana in front of a delighted Nandini and Patti thus convincing them that this was a child’s play for him. Narada requested the Lord to be present here at Oothukadu as Kalinga Nardana.

The celestial sage installed the idol of Krishna as Kalinga Narthana with Nandini and Patti standing on either side of the Lord in front of him and called this place ‘Then Gokulam’ or ‘Dakshina Gokulam.’

An interesting feature at this temple is the posture of Kalinga Narthana – Krishna’s left leg is poised on top of the demon snake but not touching it. His left thumb is holding the tail of the snake with none of his other four fingers in contact! His right leg is seen above the ground in a dance posture. On a close look, one can find the scars on his leg below the knee, the result of his fight with Kalinga.

The Kalinga Narthana temple has special significance for musicians. Venkata (Kavi) Subba Iyer lived here and composed immortal songs, including the one that describes the Kalinga Narthana.

For success in their career, up-and-coming musicians and dancers make it a point to offer their worship at this temple. This is also believed to be a Prarthana Sthalam for the unmarried, childless couples and those with Rahu and Kethu doshams.

The temple with its rich history and significance has not been maintained well. The outer walls of the temple have several cracks. The inside areas of the temple too require immediate attention. Total renovation is required if the temple is to be restored to glory. Kumbabhishekam at this temple was last performed in 1988. Another is long due but it cannot happen without the help of devotees and philanthropists.

Those interested to participate and assist in this can contact: Jayarama Bhattar at 94426 99355 or 04374 268549.

Saturday, October 10, 2009

Regarding the plight of motorists plying on sathy Road

I would like to bring to your kind attention the plight of the motorists, especially, Two wheelers and LCV’s plying on Sathy Road. The National Highways Department is constructing a new bridge across the Sanganoor Canal on Highway 209 at Lakshipuram near Ganapathy. The contractors, m/s.Shanthi Constructions, have already built a part of the bridge and have diverted the traffic on across the new bridge. They have now demolished the old bridge and started construction there as well.
But , sir, The approach fore and aft of the new bridge for about 50mts both sides is in such a condition that motorists have to move in snail’s pace. The traffic at this juncture is held up for half a kilometer both sides just because of this one point. Everyone passing this point will sure curse the H/D Department.
Sir, I a sure the H/D department while sanctioning the construction of a new bridge ,would have certainly issued a guideline for making a clear approach lane for free flow of traffic on a busy Highway before demolishing an old existing bridge. Not only the bridge, but the approach leading to the bridge should also have been made proper.
But the contractors have not made any such arrangement and left the approach area leading to the new bridge rubble. The Highways Department has turned a blind eye to this clear violation of contract agreement, I sincerely believe. It will take another 12 months, minimum, to complete this bridge. So until then, people have to suffer this if action is not taken immediately.
Will the Highway Authority look into this matter and act immediately

Labels: